Validation-first poultry vision grading
Validate before
you buy.
Designed as a ceiling/over-line retrofit around an existing processing line, subject to site survey. Developed and running on a live U.S. duck-processing line. Chicken validation is the next commercial program.
Documented end-to-end path
in the tested configuration
Current camera architecture
capturing multiple angles
Live U.S. processing-line
development proof
Next commercial
validation program
SURVEY · VALIDATE · ACCEPT · SURVEY · VALIDATE · ACCEPT · SURVEY · VALIDATE · ACCEPT ·
VALIDATE
01 — The buying problem
Proof should come before the purchase order.
A grading project should start with the plant's own birds, line conditions, defect classes, and ground-truth rules—not a generic demo result.
Validate the system against your own birds and pre-agreed acceptance criteria before the purchase decision.
Define the test population and the plant's ground truth
Survey utilities, mounting, PLC, and readiness
Agree the pass/fail path before purchase
02 — How It Works
Four stages. One pipeline.
Capture
Current architecture uses six cameras to capture the bird from multiple angles.
Detect
The current model pipeline has measured approximately 174 ms under the documented configuration.
Grade
Plant-defined grading rules and defect classes are agreed before validation. Official grading requirements remain separate.
Route
Integration is scoped during site survey. Current materials describe EtherNet/IP and selected PLC configurations.
Integration is scoped during site survey · Current materials describe EtherNet/IP and selected PLC configurations
Build the decision
from your plant's inputs.
Illustrative model; results depend on the plant's volume, borderline rate, default-down rate, recoverable share, price delta, and operating weeks. Payback is shown only from customer-approved inputs.
03 — See the System
Developed on duck.
Validating chicken next.
Developed and running on a live U.S. duck-processing line. Chicken validation is the next commercial program.
04 — What You Get
Built for the production floor.
Tested configuration
The documented end-to-end decision path is approximately 175–185 ms in the tested configuration.
Plant-defined acceptance
Accuracy, repeatability, and false-call definitions are agreed for the plant's validation—not assumed from a generic benchmark.
Validation report
The validation plan defines the test population, ground truth, metrics, acceptance decision, and evidence package.
Multiple-angle capture
Current architecture uses six cameras to capture the bird from multiple angles.
Scoped integration
Integration is scoped during site survey. Current materials describe EtherNet/IP and selected PLC configurations.
Site readiness first
Physical installation may fit a planned weekend when the site passes readiness review; validation, training, and acceptance continue afterward.
The line, end to end
05 — Let's Talk
Start with
your line.
A site survey establishes line fit, utilities, mounting, PLC scope, test population, and the validation path before a quotation is finalized.
Plant walk
We visit your facility and observe your grading process.
Custom configuration
Camera placement, PLC integration, and grading rules for your line.
Plan and build
Current planning range is 8–12 weeks after approved configuration and commercial release, subject to supply and site readiness.
Validate and accept
Chicken validation is the next commercial program, using the plant's pre-agreed acceptance criteria.
Tell us about your operation. We'll reply within one business day.